Request this package →
Choose from professionally planned two-, three- and four-bedroom homes with transparent starting prices, engineering support and a defined construction programme.
Compare size, investment and indicative construction time. Every design is adapted to the site, access, ground conditions and your approved finishes.
Prices are based on the current design scope and are subject to confirmation following site assessment, final selections, access, ground conditions, Region and client-requested modifications.
Explore the complete exterior, floor-plan and interior presentation of this substantial four-bedroom family home, including its integrated one-car garage.
Architectural renderings are illustrative. Furniture, décor, appliances, lighting and specific finishes are included only where stated in the final contract specification. Floor plans are presented for general layout reference.
Explore the complete exterior, floor-plan and interior presentation of this four-bedroom family residence, designed to prioritize indoor living space.
Architectural renderings are illustrative. Furniture, décor, appliances, lighting and specific finishes are included only where stated in the final contract specification. Floor plans are presented for general layout reference.
Explore exterior and interior visualizations of this three-bedroom home, designed around comfortable shared spaces and a clean contemporary character.
Architectural renderings are illustrative. Furniture, décor, appliances, landscaping, lighting and specific finishes may be shown for presentation and are included only where stated in the final contract specification.
Explore the complete exterior, floor-plan and interior presentation of this efficient two-bedroom home, created for comfortable everyday living.
Architectural renderings are illustrative. Furniture, décor, appliances, landscaping, lighting and specific finishes may be shown for presentation and are included only where stated in the final contract specification.
Explore exterior and interior visualizations of this efficient two-bedroom design—from its contemporary façade to the living spaces planned for everyday comfort.
Architectural renderings are illustrative. Furniture, décor, appliances, landscaping, lighting and specific finishes may be shown for presentation and are included only where stated in the final contract specification.
Use this side-by-side view to shortlist a model. Final layouts, specifications and pricing are confirmed after the site assessment.
| House model | Bedrooms | Storeys | Floor area | Indicative programme | Starting price |
|---|---|---|---|---|---|
| Signature with Garage | 4 | 2 | 2,521 sq. ft. | 8–10 months | G$51.80M |
| Signature without Garage | 4 | 2 | 2,167 sq. ft. | 8–10 months | G$44.10M |
| Young Professional | 3 | 1 | 1,364 sq. ft. | 6–7 months | G$28.76M |
| Essential Option 1 | 2 | 1 | 967 sq. ft. | 5–6 months | G$24.59M |
| Essential Option 2 | 2 | 1 | 874 sq. ft. | 5–6 months | G$23.81M |
Recommended lot dimensions and site setbacks are confirmed against the selected design, survey and applicable planning requirements.
A written specification and priced scope define what is included, what is excluded and which selections remain available to you.
The final contract specification governs each project. Inclusions and options vary by house model, site and approved client selections.
We coordinate design, estimating, programme development and construction so you receive one clear line of responsibility.
Choose the layout and investment range that best fits your household.
We review location, access, ground conditions, utilities and approvals.
Receive a final specification, price, programme and payment schedule.
Construction proceeds with planned milestones and regular progress updates.
Eco-SMART combines civil engineering leadership with practical construction delivery. The result is a home planned around buildability, cost, time and the realities of your site.
Eco-SMART brings together residential construction, renovation, civil works and project controls so proposals reflect how work will actually be delivered.
Site assessment, coordinated design, estimating, procurement planning, construction, quality checks and handover.
Planned improvements to existing buildings with attention to sequencing, occupied-site constraints and integration with existing construction.
Civil-engineering oversight supports site development and associated works beyond the building footprint.
Programmes, cost planning and progress reporting provide a structured basis for decisions throughout construction.
Our drawing packages coordinate design, engineering, programme and cost before work begins—helping reduce uncertainty on site.
Room relationships, circulation and openings are resolved as a coordinated whole before pricing and construction.
Ground conditions, loads and drainage inform the final foundation arrangement—not a one-size-fits-all detail.
Beams, columns, slabs, walls and ceilings are coordinated so the site team can build from a clear set of instructions.
A construction programme links activities, dependencies and milestones so progress can be measured against an agreed plan.
Detailed estimates connect measured quantities to labour, materials and logistics, then organize them into clear work-section summaries.
Illustrations, programme durations and cost distributions are simplified examples of Eco-SMART’s planning process and are not issued-for-construction documents or quotations. Every project requires site-specific design, review, approval, scheduling and pricing.
Work is checked progressively so key elements can be reviewed before they are covered by the next construction stage.
Building position, levels, excavation and bearing conditions are reviewed before foundation work proceeds.
Dimensions, formwork and reinforcement are checked before concrete placement.
Roofing, waterproofing, electrical and plumbing installations are checked and tested.
Snagging, testing, rectification and completion records support an orderly handover.
Eco-SMART considers site access, mobilisation, freight, material availability and local operating conditions when preparing each regional proposal.
Site assessment, design coordination, procurement planning and construction delivery from our East Bank Demerara base.
Bartica-focused planning considers river or road access, mobilisation, transportation, material storage and local operating conditions.
Construction in every region is offered subject to project size, site assessment, access, logistics, approvals and resource availability. Regional price and programme adjustments may apply.
Structured reporting gives the homeowner and project team a shared view of progress, current work and upcoming decisions.
This dashboard is a sample presentation only and does not represent a current client project.
Every proposal is project-specific, but these answers explain the normal starting assumptions.
No. Published prices relate to construction of the selected house model and assume the client has access to a suitable building lot.
They are indicative starting prices. A project price is confirmed after site assessment, scope definition, regional logistics and final selections.
Yes, subject to technical review. Changes may affect approvals, floor area, structure, price and programme.
The required approval responsibilities and fees are defined in the proposal. Eco-SMART can coordinate the supporting design documentation within the agreed scope.
Payments are aligned to an agreed schedule and construction stages. The final arrangement is stated in the contract.
Mobilisation, freight, access, accommodation, material availability, storage and local site conditions can affect regional pricing.
Yes. Depending on the agreed service, the project pack can include drawings, specifications, estimates, programmes, payment stages and progress information.
Applicable workmanship obligations, product warranties and defect-correction terms will be stated in the final contract for the selected project.
Select a home, construction region and finish level. This planning range helps frame an initial conversation; it is not a quotation.
Final cost depends on survey information, geotechnical conditions, access, utilities, finishes, freight and approved design changes.
Discuss this estimate →Tell us where you plan to build and which home fits your vision.
Share a few project details and we’ll respond with the right next step.